top of page
Untitled_edited.jpg

Case Studies

Mobilisation Project OWF Yulin, Taiwan, 2024

Offshore Container– Hazardous Zone

Location: Offshore, Thailand
Client: UK Subsea Equipment Manufacturer
Equipment: Certified Electrical 10FT Offshore DNV Workshop Container 

Problem

Problem

The client was unable to source for a fully certified Electrical DNV 10FT Workshop Container available in Thailand or APAC region.

Solution

Solution

Riviera converted an existing 10FT DNV Container unit from our partner’s existing fleet to a fully certified electrical workshop container. The unit was modified to be used in Hazardous area offshore

Value-Add

Value-Add

By tapping into Riviera’s strong international network, BallTec was able to find a solution promptly and suitable for their needs

10FT DNV Offshore Container

DNV 10FT Container with customised shelves, work benches, etc..

Mooring Buoys - Testing Application

Location: Offshore, Singapore
Client: Dutch EPCI Contractor
Equipment: 60 Pieces of Mooring Buoy 

Problem

Problem

The Client's Vessel was due to sail in 3 days & needed to execute Hydroacoustic Release tests offshore. There was a requirement for an urgent delivery for 60 pieces of Mooring Buoys to be equipped with the hydro line and the buoys had to have a decent buoyancy at water depth of 5 meters. The client's procurement was unable to source for the technically apt solution nor in the quantities needed in the region.

Solution

Solution

Within 1 working day, Riviera managed to pull together all 60 pieces, technically sound, fully certified mooring buoys

Value-Add

Value-Add

Riviera Team’s displayed acute Technical Expertise on this urgent mobilisation. Together with their strong network, the solution was promptly delivered in time to the vessel.

Placeholder Image

Vessel Support

Location: Shipyard, Singapore
Client: Vessel Owner, Netherlands
Equipment: Yokohama Fenders, 3.3m x 6.5mtr 

Problem

Problem

Due to the arrival schedule of the vessel, there was limited shipyard space available for berthing. The shipyard’s quayside fenders were also not sufficient to prevent any damage of the vessel while berthing

Solution

Solution

With Riviera’s strong connections with the local shipyards, a berthing space was made available within 72 hours. In addition, a rental package of 4 Units of 3.3m x 6.5mtr Yokohama Fenders for the duration of the berth was provided

Value-add

Value-Add

Riviera Marine has a sizeable inventory of Fenders (2.5, 3.3 & 4.5m) available for rental &/or purchase. Due to the nature of the short-term port call, Riviera provided cost-efficient options – rental as part of the berthing package

Yokohama Fender

3.3m Yokohama Fenders 

Client Feedback

Their expertise transformed our operations significantly.

"With Riviera Marine's expansive & global network, it helped us build our Brand Awareness throughout the Oil & Gas Market, increasing our exposure to potential sales opportunities. Their Business Development and (Re)Branding & Marketing strategies have resulted in a more than 50% increased in social media followings in less than 8 months."

B.Vossenberg JR

Executive Director

image 50

"Riviera Marine Team brought value-added technical & commercial expertise to our projects, ensuring cost optimization and prompt troubleshooting. New Tech Solutions were also developed upon our request to streamline administrative process."

Jean-Christophe F

Supply Chain Lead

image 51

"The Riviera Marine Team's passion and dedication goes above and beyond a traditional consultancy model. Our requirements were always dealt with prompt reactivity & support"

J. Teo-Anderson

CEO

Original (3) 1.png

"One of the most accountable rigging supplier I ever met. The Riviera Team is highly dedicated and will definitely ensure that required equipment are delivered in good order and on time."

A.Fernandez

Client Representative, Qatar

Rectangle 8.png

Connect with Industry Experts

Discover how our innovative solutions can transform your energy operations. Let’s collaborate.

bottom of page